Sukkah Day 15

1. What did you do today (describe the process of what you accomplished)? – minimum of 3 complete sentences

Today I was able to get the window completely ready to be put in the wall. I wasn’t able to put it in the wall though because for some reason we’re going to wait to do that until the wall is up or something like that. After that was done I was able to help SM21 and SE21 with painting the giant MJDS the correct colors We were then able to finish that and get it ready to be hung up.

2. What is one thing you have done so far you were initially scared/worried about, but now feel more confident in after all this practice? – minimum of 3 complete sentences

I was really scared about being able to screw in all the screws. In the past, I am not good at stripping screws. It definitely helped that then screws we were using were unstrippable (I still managed to strip one). Other than the one screw that got stripped because we were using the wrong drill bit, I was able to get in all the screws without a hitch.

3. Give a step by step account of what you have done so far to get our Sukkah up to where it is today.

  1. We planned the design for our sukkah
  2. We decided on a design for our sukkah
  3. We figured out what materials we needed to build the sukkah
  4. We bought those materials
  5. We screwed in the top and bottom plates.
  6. We then put carriage bolts in the top and bottom plates
  7. We brought all the wood that we needed outside
  8. We connected the corner plates and the bottom plates
  9. We figured out how we needed to cut the studs
  10. We cut the studs
  11. We screwed and nailed in all our studs
  12. We Cut out the space for our window
  13. We screwed in our windows top and bottom plates
  14. We painted our MJDS

 

SM21 attaching the much troubled “S” in MJDS together.

A sneak peek at our MJDS

YG21 and I screwing in our window’s top and bottom plates.

Leave a Reply

Your email address will not be published. Required fields are marked *