Sukkah Day 15

1. What did you do today (describe the process of what you accomplished)? – minimum 3 complete sentences
We put 3 of the walls up and SG and I screwed in supports so that people would not have to hold up the walls all day. We also brought up ES wall to the place the sukkah will be at. We almost finished securing 2 of the walls together.

2. What is one thing you have done so far you were initially scared/worried about, but now feel more confident in after all this practice? – minimum 3 complete sentences

I was initially scared that when we are bringing the walls it will fall on someone, but now I have more faith that we have the strength that no one will get crushed. I was scared to let other people do a lot of work because I wasn’t sure that they were going to do a good job. But now I know that I can let some other people take the wheel because I have seen that I am not necessarily the best at everything.

3. Give a step by step account of what you have done so far to get our Sukkah up to where it is today.

  1. we made a plan
  2. we modeled the plan
  3. we got the wood ready/ bought the wood
  4. we put the carriage bolts in the top, bottom, and side plates
  5. we brought the wood outside
  6. we made the rim by screwing and nailing the plates together
  7. we cut the studs at a 10 degree angle so it would fit in the slanted top plate
  8. we screwed and nailed the studs in
  9. we brought the walls to the place where the sukkah would be
  10. we put the walls up and secured them so that they won’t fall with 2×4’s
  11. we put carriage bolts into both the walls

 

Here I am screwing a 2×4 into the wall to make sure it doesn’t fall

Here BW is putting a nut into a barrage bolt

Here is a picture of the MJDS that will be up on the sukkah