Sukkah Day 13

0

Posted by dgray21 | Posted in Sukkah Project | Posted on October 2, 2019

include AT LEAST 2 photos from Friday

1. Today, we worked on moving 3 of the 4 walls and it felt Really really great to do this because I feel like we are getting so freaking close to the end of the building process.

2. An example of when I worked well with a classmate was when I was talking with ari about something personal and after talking with him I felt much better. I think that we need to get along better because I know that when he helped me I felt much better.

3. I have only the plywood and decorations left on my Sukkah wall. I am feeling Not bad about the amount of work left because there isn’t that much left and we’re almost finished!

This is the entire group just hammering away at some nails! we got all of them done today!

This is after I was done hammering my nail and Oren needed some help so this is when I was trying to help him. Meanwhile, the other members of the group were still hammering away… (IM A STRONG HEALTHY BOI)