Posted by dgray21 | Posted in Sukkah Project | Posted on October 2, 2019
include AT LEAST 2 photos from Friday
1. Today, we worked on moving 3 of the 4 walls and it felt Really really great to do this because I feel like we are getting so freaking close to the end of the building process.
2. An example of when I worked well with a classmate was when I was talking with ari about something personal and after talking with him I felt much better. I think that we need to get along better because I know that when he helped me I felt much better.
3. I have only the plywood and decorations left on my Sukkah wall. I am feeling Not bad about the amount of work left because there isn’t that much left and we’re almost finished!